Before
After
• Cost of Project: £1.17 million
• Duration: 10 months
• Description:
At 18 St. Mary’s Road in Peckham, we executed a comprehensive renovation and extension project for a school catering to children with disabilities. The project, which took 11 months and cost £1.1 million, included the following:
• Extensions: Construction of a two-storey side extension and a one-storey rear extension to expand the facility’s capacity.
• Complete Refurbishment: Full refurbishment of the ground, first, and second floors, including all new plumbing, electrical systems, and insulation to meet modern standards and ensure a comfortable environment.
• Bathrooms: Installation of nine new bathrooms as per the client’s specifications, ensuring accessibility and convenience for the students.
• Interior Upgrades: Demolition of the interior down to the brickwork, followed by the installation of brand-new stairs, vinyl flooring throughout, and comprehensive interior finishes.
• Exterior Work: Complete repointing of the exterior, roof repairs, and the creation of a new garden at the back and a new driveway at the front.
• Special Features: Extensive insulation work to provide a safe and efficient environment for the children.
This project showcases our ability to handle large-scale renovations with precision, creating a modern, functional, and welcoming space tailored to the specific needs of its occupants.