Peckham High Street

Before

After

Cost of Project: £650,000  

Duration: 8 months

Description:

At 100 Peckham High Street, we undertook an extensive restoration project, transforming the historic Lancaster School from 1822 into a modern, adaptable space, potentially for office use. This ambitious project, completed over eight months, involved a wide range of construction and restoration activities to maintain the building’s historical integrity while upgrading its functionality.

We installed a brand-new roof, including a top section crafted from lead to replicate the original 1822 design. The project also included a loft conversion and a new extension on the first floor. We replaced all electrical systems, plumbing, and underground pipes, ensuring the building met modern standards.

New stairs and screeding were installed, alongside reinforced concrete and metals, designed by a structural engineer to ensure safety and stability. We also installed brand-new pillar stairs, replicating the original 1822 design. The entire building, encompassing approximately 350 square meters, was meticulously restored to mirror its historical appearance, both on the facade and inside.

This project highlights our dedication to preserving historical architecture while providing modern amenities, creating a space that honors its past while serving contemporary needs.

Battersea Park RoadBlackheath Road
HOW TO GET IN TOUCH

CONTACT US

Got questions, feedback, or just want to say hello? Reach out through our Contact Us form! We’re all ears and ready to assist you.

Hours:

Mon-Fri: 9am – 5pm
Sat: 9am – 2pm
Sun: closed

Phone:

020 363 37949

Address:

7 Town quay wharf,
Abbey Road, IG11 7BZ